Monahans, West Texas, United States
Monahans Data Center Campus
2.5 MW of initial IT capacity backed by operating natural gas generation, with phased expansion toward a 300 MW campus master plan.

01 / Overview
Natural Gas Power.
Phased AI Capacity.
Located in Monahans, West Texas, in the Permian Basin, the campus combines operating, behind-the-meter natural gas generation with modular data center infrastructure. Phase 1 targets 2.5 MW of IT capacity within a 3.5 MW facility, with ready for service targeted for February 28, 2027.
Designed for high-density AI workloads, the facility uses liquid cooling to support rack densities of up to 240 kW per rack at a design PUE of ≤1.35. The campus plans dual-carrier connectivity and sits along the I-20 corridor, with access to Midland International Airport.
Expansion is planned to reach 40 MW of total facility capacity during 2027, within a 300 MW long-term campus master plan. Future phases will align with tenant demand and remain subject to development.
02 / Specifications
Technical Specifications
| Location | Monahans, West Texas · Permian Basin |
|---|---|
| Phase 1 IT capacity | 2.5 MW |
| Phase 1 facility capacity | 3.5 MW |
| Power | Operating natural gas generation · Behind-the-meter |
| Power resilience | 2N electrical design · N+1 UPS |
| Cooling | Liquid-cooled modular design · N+1 redundancy |
| Design rack density | Up to 240 kW/rack |
| Design PUE | ≤1.35 |
| Connectivity | 2 × 200 Gbps planned · Dual-carrier fiber |
| Target ready for service | February 28, 2027 |
| 2027 planned expansion | 40 MW total facility capacity |
| Long-term master plan | 300 MW planned campus capacity |
Capacities, specifications and service dates are design targets or plans, subject to confirmation. Carrier services and fiber routes remain to be confirmed.